Technical Specifications

  • 1. Reinforced Concrete Foundation Construction
    • Buildings are constructed in accordance with ‘spread footing ’ technique of Specification Codes for Earthquake Resistant Building Design..
    • Projects on architecture, structure, mechanics and electricity are prepared in accordance with related legislation, regulations and specifications. Construction will be implemented in line with these requirements..
    • The construction process will be closely monitored by construction inspection specialists from the project development till its delivery.
    • According to TSE standards, water-resistant basement construction techniques such as ‘basement tanking’ will be applied in order to minimize the effects of groundwater and moisture on construction.
  • 2. Walls and Thermal Insulation
    • The walls will be constructed in accordance with related energy legislation, regulations and specifications.
    • oating will be applied on exterior walls in line with thermal insulation specifications.
  • 3. Roof
    • Cement will be placed at the ground of the roof, covered by membrane, following by 6 cm polyurethane foam, felt underlayment and roofing granules.
    • Roof waterproofing and thermal insulation will be implemented in accordance with energy regulation and specifications. All materials we use are compatible with TSE standards.
  • 4. Gypsum Plaster
    • Plaster will be applied on external walls of constructions.
  • 5. Exterior Facade
    • Exterior coating application will be performed in line with special requirements of architecture experts.
    • "Top quality exterior paint" will be applied on remaining areas.
  • 6. Interior Painting
    • The internal walls of all buildings will be painted by ‘Marshall’ products or equivalent brand.
  • 7. Frames and Windows
    • Premium aluminium frames, thermopane windows and accessories will be used in line with construction requirements and project plan.
  • 8. Building Entrance, Corridor and Stairs
    • According to the architectural design, marble or premium quality ceramics will be used in stairs and entrance construction.
  • 9. Sanitary System
    • GROHE brand will be used for sanitary ware units.
    • The materials of ‘Fırat’ or the equivalent brand compatible with TSE requirements will be used for waste and clean water installation.
  • 10. Doors
    • The apartment’s entry door will be ‘steel door’.
    • Premium solid core and laminated doors will be used in interior design.
    • Tüm‘Kale’ lock system and brass handles will be used in all doors.
  • 11. Electric system
    • Electric system will be implemented in line with Electrical Engineering Chamber and TEDAS regulations.
    • Materials used will be compatible with TSE requirements.
    • Siemens circuit brakers will be installed.
    • Viko plug-socket units or equivalent brand materials will be used.
    • On common areas sensor lighting fittings will be installed.
    • Three-phase electric power system will be set up.
    • Electric socket, computer, TV and telephone lines will be installed in each apartment.
    • intercom system will be used for communication between building’s main entrance and apartment.
  • 12. Internet and Satellite Systems
    • Terrestrial broadcast and central satellite receiving systems will be set up.
    • The internet infrastructure will be built.
  • 13. Heating and Cooling System
    • Air conditioning system infrastructure will be established in all rooms.
  • 14. Interior Spaces
    Bathroom
    • Flooring: first-class quality ceramics (Ege Seramik or equivalent brand).
    • Wall covering: first-class quality ceramics (Ege Seramik or equivalent brand).
    • Ceiling covering: plaster, suspended ceiling.
    • Sanitary fittings: premium GROHE units
    • Sanitary ware: premium sanitary ware of DURAVIT, IDEAL STANDART or equivalent brands
    • Concealed flush tank and water saving closet will be installed.
    • Shower Trays: shower trays of CORIN brand; tempered glass will be used for shower enclosure.
    • Accessories: Chrome tower, toilet paper holders, soap dish and hanger will be set up.
    • Water-resistant insulation flooring will be applied using materials compatible with TSE standards.
    Kitchen
    • Flooring: first-class quality ceramics.
    • Wall covering: Water-based paint will be applied on plastered walls. Laminated glass will be used for space between the countertop and upper cabinet.
    • Cabinets: Depending on the design, lacquered or shiny lacquered panels will be used.
    • Counter: Laminated counters will be installed in line with project plan.
    • Sanitary fittings: premium GROHE units
    • Sink: 1 or 1,5-compartment stainless steel sink .
    Living Room and Other Rooms
    • Laminated flooring will be used in apartments.
    Entry and Corridors
    • Premium ceramics will be used in entry and corridors.
    Doors
    • Steel core wood doors will be used for apartment entry doors.
    • Lacquered wood doors will be used for internal doors.
    Ceiling
    • Water-based paint will be applied on plastered ceilings.
  • 15. Parking
    • Underground parking will include 17 parking spaces with automatic shutter.